Fuzor VDC
Revit geometry tied to the programme activities.

Engineering & technology
Murphy Prime uses 4D simulation to plan MEP work in congested plant rooms and anywhere the sequence is as important as the drawing. The model is a conversation with the client about milestones, not only an internal planning file.
Revit MEP is linked to the construction programme so each piece of plant and each material has an activity. Fuzor VDC is the integration tool. The simulation shows the installation over time and gives the construction team a way to count daily lifts, place storage, mark drop zones, and decide the order in which material moves across the floor.
On a plant room that sits on the critical path, that planning is the job. Each MEP element is numbered and tied to an activity. The crew installs to that list. Nothing is “figured out on the day” inside a room that cannot be rebuilt twice.
Revit geometry tied to the programme activities.
Lifts, laydown, drop zones, and shifting planned in the model.
Plant rooms on the programme path get an element-by-element sequence.