Data centres
Hyperscale, colocation, and enterprise halls, with MEP leading the programme and about 70 percent of distribution prefabricated.
Services
Each line below is a full page. The scopes are the work Murphy Prime bids: data centres, design-build, MEP construction, prefabrication, energy, operations, and utilities.
Hyperscale, colocation, and enterprise halls, with MEP leading the programme and about 70 percent of distribution prefabricated.
EPC delivery so an early award is checked against a real budget, with in-house engineering through installation.
Mechanical, electrical, and plumbing since 2001, and main-contractor delivery where the building exists to house the plant.
More than 40,000 modules since 2015, drawn in Revit and set out from the model. Installation hours drop by about 40 to 60 percent.
LEED-capable MEP engineering, efficient plant, and operations support after substantial completion.
A design, build, and operate model, with one BIM file from equipment selection through handover.
Medium and large utility plant, pump rooms, and recorded underground work coordinated with the building systems.
Send drawings, the specification, and the bid date. The office will confirm whether the package sits inside our trade range before a full estimate is opened.
Submit an inquiry